International Boundary and Water Commission (US–Mexico) · INTERNAT. BOUNDARY AND WATER COMM.
Account requiredWhy it scored this way
Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.
Written against this notice and what you have told us about your company. Anything we do not know is marked [NEEDS INPUT] in the draft rather than guessed at — read it before you send it.
Start a free trial to draft these. Nothing is sent to an agency on your behalf, ever — you get a document to review, edit and submit yourself.
Compliance matrix
Every stated and implied requirement, its source section, whether it is mandatory, and where your response will address it.
Proposal outline
A submission skeleton where every required element is a heading with its source requirement quoted beneath it. You write the substance; nothing gets forgotten.
Questions to submit
Genuine ambiguities and requirements that disadvantage a smaller bidder, drafted as questions you can submit before the Q&A deadline.
Past performance write-ups
Which of your prior awards best match this requirement, and draft write-ups in the format the agency asked for.
Solicitation details
Solicitation number
191BWC26R0006
Notice type
Solicitation
NAICS
237990
Product service code
2050
Set-aside
No Set aside used
Posted
2026-08-13
Response deadline
Sep 9, 2026, 9:00 PM UTC
Place of performance
Mercedes, TX
Contracting contact
adrian.knights@ibwc.gov
Market intelligence
Account requiredWho wins this work, and what it pays
Comparable awards under NAICS 237990 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.
The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the complete the Design-Build of Retamal Dam Buoy System. Upon conclusion of the project, the new waterway barrier line will prevent public access to dangerous hydraulics upstream/downstream of the dam, the warning system and signage will alert the public of the danger ahead providing a waterway barrier line to include anchors, alert system, and warning signs at the Retamal Dam. The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, disposal of debris and construction waste, quality control testing. The working hours of the USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work on site during these proposed hours. USIBWC facilities, including the dam, are closed during all federal Holidays. Workers must pass though USIBWC levees to access Retamal Dam. Boarder Patrol are present in the area. Contractor and subcontractor shall have identifying vehicular when working in the area. US Fish and Wildlife own land adjacent to Retamal Dam. Contractor shall stay clear of US Fish and Wildlife property. A site visit date is listed in the Solicitation. A completed Form 358 is also required prior to attendance at the prebid site visit. This requirement will be solicited under FAR Part 36 and FAR Part 15. All responsible sources must submit a bid to be considered by the Agency.
Contact
Point of contact
Adrian Knights
Role
not stated on this notice — SAM publishes a role for only about 5% of them, so this may be a contract specialist rather than the contracting officer
Email
adrian.knights@ibwc.gov
Submit questions
Ambiguities and requirements worth clarifying, written as questions you can send before the deadline.
Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.
Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.