GovSprint
← Back to today

Big Piney Office Interior Sewer Line Replacement

Department of Agriculture · Forest Service · BRIDGER-TETON NATIONAL FOREST
Account requiredWhy it scored this way

Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.

Draft the paperwork

Written against this notice and what you have told us about your company. Anything we do not know is marked [NEEDS INPUT] in the draft rather than guessed at — read it before you send it.

Start a free trial to draft these. Nothing is sent to an agency on your behalf, ever — you get a document to review, edit and submit yourself.

Compliance matrix

Every stated and implied requirement, its source section, whether it is mandatory, and where your response will address it.

Proposal outline

A submission skeleton where every required element is a heading with its source requirement quoted beneath it. You write the substance; nothing gets forgotten.

Questions to submit

Genuine ambiguities and requirements that disadvantage a smaller bidder, drafted as questions you can submit before the Q&A deadline.

Past performance write-ups

Which of your prior awards best match this requirement, and draft write-ups in the format the agency asked for.

Solicitation details

Solicitation number
1240LT26Q0154
Notice type
Solicitation
NAICS
237110
Product service code
Y1ND
Set-aside
Small Business Set Aside - Total
Posted
2026-08-14
Response deadline
Sep 14, 2026, 11:00 AM UTC
Place of performance
Big Piney, WY
Contracting contact
terri.tucker@usda.gov

Market intelligence

Account requiredWho wins this work, and what it pays

Comparable awards under NAICS 237110 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.

Statement of work, as posted

This project consists of replacement of the sewer line and related repair work on the Big 1.2 Piney Ranger Station on the Bridger-Teton National Forest (NF). The facility is operated by the Bridger-Teton NF on the Big Piney Ranger District in Big Piney, Wyoming. Work will include demolition of finished flooring as needed, demolition of concrete slab along 81’ of sewer line, disconnection of 17 plumbing fixtures, replacement of sewer line, patching of concrete slab and replacement of aggregate, reconnection of 17 plumbing fixtures, and replacement of finished flooring. Work includes the removal and proper disposal of all demolished materials. The contractor shall provide all required materials. Quotes should describe the method that will be used to replace the sewer line, and what areas will be effected by related demolition work.

Contact

Point of contact
Terri Tucker
Role
not stated on this notice — SAM publishes a role for only about 5% of them, so this may be a contract specialist rather than the contracting officer
Email
terri.tucker@usda.gov
Submit questions

Ambiguities and requirements worth clarifying, written as questions you can send before the deadline.

Open email
Request documents

Ask for attachments, drawings or specifications referenced in the notice but not posted.

Open email
Add me to interested vendors

Ask to be listed as an interested vendor so other bidders can find you for teaming.

Open email

Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.

Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.