EIE466 ADAL JPARC Range Operations Center, Eielson Air Force Base, Alaska
Department of Defense · Department of the Army · W2SN ENDIST ALASKA
Account requiredWhy it scored this way
Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.
Written against this notice and what you have told us about your company. Anything we do not know is marked [NEEDS INPUT] in the draft rather than guessed at — read it before you send it.
Start a free trial to draft these. Nothing is sent to an agency on your behalf, ever — you get a document to review, edit and submit yourself.
Sources Sought response
A complete draft response — capability statement, relevant past performance, business size and socioeconomic status, and answers to the agency's specific questions.
Questions to submit
Genuine ambiguities and requirements that disadvantage a smaller bidder, drafted as questions you can submit before the Q&A deadline.
Past performance write-ups
Which of your prior awards best match this requirement, and draft write-ups in the format the agency asked for.
Solicitation details
Solicitation number
W911KB27RA003
Notice type
Special Notice
NAICS
236210
Product service code
Y1AZ
Set-aside
Unrestricted
Posted
2026-08-18
Response deadline
Aug 21, 2026, 8:00 PM UTC
Place of performance
Eielson AFB, AK
Contracting contact
jason.linn@usace.army.mil
Market intelligence
Account requiredWho wins this work, and what it pays
Comparable awards under NAICS 236210 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.
REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE Notice: This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future. NAICS Code: 236210 – Industrial Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Alaska District, has a requirement for constructing a new 3,515 Squar Meter facility across Flight Line Avenue from Building 1151 in support of the Alaska Red Flag mission, including all air operations for major combat training in a joint, multinational, multi-domain, and unconventional environment against 21st-century near-peer competitors. The facility will include administrative space, building support space, and secure workspace for mission-critical activities. The facility shall be a multi-story structure with a non-frost-susceptible foundation system. Work includes, but is not limited to, the construction of a facility with a conventional shallow concrete foundation system, steel structure and framing, and seismic design with special concentrically braced frames. The building exterior will feature Eielson Air Force Base Installation Facility Standards-compliant metal siding panels and a compatible membrane low-slope roof system. Standing seam metal roofing shall be used where visible from the ground. The facility will be air-conditioned and supported by base-wide district utilities for steam, water/sewer, and electricity. Soils remediation is required to mitigate, transport, and dispose of hazardous soils off-site. Infrastructure and facility design should be compatible with applicable Department of Defense, Air Force, and base design standards. Work will include all subgrade and subbase work, drainage, foundation, and facility assembly. Additionally, local materials and construction techniques should be used where cost-effective. The facility will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01. Estimated Acquisition Magnitude: $50,000,000 to $100,000,000 Planned Acquisition Strategy: Anticipated to utilize Construction Manager at Risk via Other Transaction Authority (OTA) The Alaska District is conducting market intelligence to assess industry capability and interest in supporting this effort utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a, Facility Construction or Repair: Transactions Other Than Contracts and Grants. This authority is distinct from the Department of Defense prototype OT authorities commonly associated with 10 U.S.C. § 4021 and 4022. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. The anticipated delivery method is Construction Manager at Risk (CMAR). Phase 1: Pre-Construction Services - The OT Awardee shall assist the Government collaboratively in achieving its goals with respect to the project’s scope, constructability, budget, quality, schedule, and in coordination with the Designer of Record (DOR). Phase 2: Construction - Upon reaching an agreed-upon level of design (e.g., 95 to 100%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the construct the facility via alternative methods. SUBMISSION INSTRUCTIONS: Please follow the link: https://forms.osi.apps.mil/r/0cGuS5MpFU to MS Forms and submit the questionnaire. The questionnaire will close for responses on 28 August 2026 at 12:00PM Alaska Time. Any questions regarding the requirement or issues with MS Forms please reach out to Jason Linn at jason.linn@usace.army.mil and Michelle Nelsen at michelle.nelsen@usace.army.mil
Contact
Point of contact
Jason Linn
Role
not stated on this notice — SAM publishes a role for only about 5% of them, so this may be a contract specialist rather than the contracting officer
Email
jason.linn@usace.army.mil
Secondary
michelle.nelsen@usace.army.mil
Submit questions
Ambiguities and requirements worth clarifying, written as questions you can send before the deadline.
Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.
Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.