SLAC CUIR SP1 Master Substation Annex Building Construction
Department of Energy · SLAC Natl Accel Lab -DOE Contractor
Account requiredWhy it scored this way
Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.
The requirements that decide a bid — bonding, clearances, experience minimums, page limits — live in the attachments, not in the notice above. Start a free trial to upload them and have them read.
Draft the paperwork
Written against this notice and what you have told us about your company. Anything we do not know is marked [NEEDS INPUT] in the draft rather than guessed at — read it before you send it. Federal notices routinely put the real requirement in an attachment; adding the documents above makes every one of these materially better.
Start a free trial to draft these. Nothing is sent to an agency on your behalf, ever — you get a document to review, edit and submit yourself.
What would disqualify you
Read straight from the solicitation documents: the bonding, clearances, insurance minimums, experience thresholds and deadlines that decide whether you can bid at all — before you write a word.
Sources Sought response
A complete draft response — capability statement, relevant past performance, business size and socioeconomic status, and answers to the agency's specific questions.
Questions to submit
Genuine ambiguities and requirements that disadvantage a smaller bidder, drafted as questions you can submit before the Q&A deadline.
Past performance write-ups
Which of your prior awards best match this requirement, and draft write-ups in the format the agency asked for.
Solicitation details
Solicitation number
SLAC_RFP_368509
Notice type
Sources Sought
NAICS
236220
Set-aside
Unrestricted
Posted
2026-10-19
Response deadline
Oct 27, 2026, 12:00 AM UTC
Place of performance
Menlo Park, CA
Contracting contact
quyen@slac.stanford.edu
Market intelligence
Account requiredWho wins this work, and what it pays
Comparable awards under NAICS 236220 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.
THIS POSTING IS FOR "SOURCES SOUGHT ONLY." PLEASE DO NOT SUMBIT BIDS. While the DRAFT RFP package has been included with this post, the RFP has NOT yet been released. Interested Vendors should express their interest on the Interested Vendors List through this SAM.GOV posting or by emailing the procurement specialist. SLAC CUIR SP1 MASTER SUBSTATION ANNEX BUILDING CONSTRUCTION DESCRIPTION This is a Sources Sought Notice to identify general contractors capable of building the planned Master Substation Annex Building work under Subproject 1 of the Critical Utilities Infrastructure Revitalization (CUIR) Project. This is not a solicitation for proposal or quotations and no award will be made from this Notice. SLAC intends to issue a formal solicitation later based on responses from this Source Sought Notice. BACKGROUND Many of SLAC’s utilities were installed in the 1960s as part of the original laboratory construction. These original utilities were not designed to support the experimental parameters needed for science research today and in the future. The purpose of the Critical Utilities Infrastructure Revitalization (CUIR) Project is to modernize utility infrastructure to provide reliable and sustainable operations, enabling SLAC National Accelerator Laboratory (SLAC) to remain mission-ready and enhance the impact of Department of Energy (DOE) scientific programs. CUIR is a project directly funded by the DOE's Office of Science. The project is organized into three subprojects to efficiently execute utility improvements in alignment with lab priorities and operational downtime schedules. PLANNED SCOPE AND DESCRIPTION OF SERVICES The project involves work inside the SLAC Master Substation Yard, adjacent to an existing Building B016 which serves as the control center for SLAC electrical power systems. Scopes under this contract includes: Construction of a new Master Substation Building (B017S) ; Installation of new medium-voltage switchgears (provided by SLAC as Government Furnished Property); Relocation of an existing generator; Replacement of an existing substation; Installation of new busways connecting existing and new tie breakers; and Reconnection of 12kV cables within existing substation building to the newly installed building. As the existing Building B016 s must remain functional throughout construction, the work must be carefully planned and coordinated to protect existing systems, maintain laboratory operations, and minimize electrical service interruptions. DRAFT REQUEST FOR PROPOSAL SLAC will use a Best Value Trade Off selection method to identify the most qualified design-build subcontractor. The draft Request for Proposal and relevant references are provided to present the general scope and acquisition method for the project. The draft documents provided are subject to change and should not be construed as a solicitation. This Sources Sought Notice is NOT A SOLICITATION, but instead is to identify interested vendors for the upcoming formal solicitation release. SOURCES SOUGHT RESPONSE Interested contractors with the skills, capability, workload capability, and ability to obtain bonding to complete the planned project scope are invited to submit a written response to this Sources Sought Notice. Interested Vendors should express their interest on the Interested Vendors List through this SAM.gov posting, or by emailing the Primary Point of Contact. Please provide the following information via email: Company Name Name, telephone number, and email address of a company point of contact who has the authority and knowledge to clarify responses. Bonding capacity A statement of your company’s interest in receiving the formal solicitation notice and in submitting a responsive statement of qualifications. Please provide your response to Quyen Weng at quyen@slac.stanford.edu by 5 pm PDT on October 26, 2026. SOURCES SOUGHT DISCLAIMER: Please note that any responses to this sources sought posting is purely on a voluntary basis. SLAC is not requesting a proposal, any pricing, or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain pricing, proprietary information, or confidential information will be discarded by SLAC.
Contact
Point of contact
Quyen Weng
Role
not stated on this notice — SAM publishes a role for only about 5% of them, so this may be a contract specialist rather than the contracting officer
Email
quyen@slac.stanford.edu
Submit questions
Ambiguities and requirements worth clarifying, written as questions you can send before the deadline.
Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.
Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.