GovSprint
← Back to today

Emergency Power Plant – Fuel Storage (EPP-FS) - Cavalier SFS, ND

Department of Defense · Department of the Army · ENDIST OMAHA
Account requiredWhy it scored this way

Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.

Draft the paperwork

Written against this notice and what you have told us about your company. Anything we do not know is marked [NEEDS INPUT] in the draft rather than guessed at — read it before you send it.

Start a free trial to draft these. Nothing is sent to an agency on your behalf, ever — you get a document to review, edit and submit yourself.

Sources Sought response

A complete draft response — capability statement, relevant past performance, business size and socioeconomic status, and answers to the agency's specific questions.

Questions to submit

Genuine ambiguities and requirements that disadvantage a smaller bidder, drafted as questions you can submit before the Q&A deadline.

Past performance write-ups

Which of your prior awards best match this requirement, and draft write-ups in the format the agency asked for.

Solicitation details

Solicitation number
W9128F24C0027
Notice type
Special Notice
NAICS
237120
Set-aside
Unrestricted
Posted
2026-08-21
Response deadline
Sep 3, 2026, 7:00 PM UTC
Place of performance
Cavalier, ND
Contracting contact
ariel.e.vogan@usace.army.mil

Market intelligence

Account requiredWho wins this work, and what it pays

Comparable awards under NAICS 237120 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.

Statement of work, as posted

The USACE Omaha District intends to negotiate on a sole source basis for a contract modification to HCPA-GARCO JV1 in accordance with Federal Acquisition Regulations (FAR) 6.302-1, Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. The modification is to remediate and render inert the existing underground storage tanks that have been rendered obsolete with the construction of the new Emergency Power Plant – Fuel Storage (EPP-FS) storage tanks. These Underground Storage Tanks (USTs) will need to be remediated and removed or rendered inert within a certain time period (determined by the North Dakota Tank Program Office) once EPP-FS construction is complete. Compliance with state and federal regulatory requirements, to include testing, permitting, and reporting, will be required. Additional work may include repairs to the existing underground vault housing the USTs, remediation of contaminated soils, removal of existing mechanical equipment, and associated grading and site work. The work is similar in nature to existing requirements in the contract and the contractor is currently performing a broad scope of both new construction and existing equipment integration as part of the contract. The current contract includes UST construction with associated mechanical, electrical, and plumbing equipment, along with earthwork, and concrete. The contractor, HCPA-Garco JV, will be able to perform the entirety of the work within their current purview. The total value of current contract and executed work is approximately $19,129,000.00. The additional work is estimated to be between $500,000 and $1,000,000. This amount is approximately between 2.6% and 5.2% of the current contract and additional time specific to this modification will be added to the current contract as needed and based upon negotiations. THIS NOTICE IS NOT A REQUEST FOR COMPETITIVE PROPOSALS and no solicitation will be issued; however, any System for Award Management (SAM) registered firm that can meet the requirement may give a written notification to the Contracting Officer in the form of a capability statement, including an explanation how the contractor would be able to effectively and efficiently operate in the same footprint as the Determination of Responsibility (DOR) contractor at the same time. Responses must be provided by 03 September 2:00 PM CENTRAL. A determination by the Government not to compete this procurement will be based on market research, including responses to this notice. It is within the Government's sole discretion to decide whether the information received in response to this notice warrants development of an alternative approach or not. Information received will be considered solely for the purpose of determining whether to conduct a competitive procurement. The USACE, Omaha District, will not reimburse any firm for developing a response to this notice. The NAICS code is 237120 and the size standard is $45M.

Contact

Point of contact
Ariel Vogan
Role
not stated on this notice — SAM publishes a role for only about 5% of them, so this may be a contract specialist rather than the contracting officer
Email
ariel.e.vogan@usace.army.mil
Secondary
brittany.c.gull@usace.army.mil
Submit questions

Ambiguities and requirements worth clarifying, written as questions you can send before the deadline.

Open email
Capability response

Introduce your firm against this requirement for a Sources Sought or market research notice.

Open email
Request documents

Ask for attachments, drawings or specifications referenced in the notice but not posted.

Open email
Add me to interested vendors

Ask to be listed as an interested vendor so other bidders can find you for teaming.

Open email

Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.

Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.