GovSprint
← Back to today

Pumping Assembly, Water

Department of Defense · Defense Logistics Agency · DLA LAND WARREN
Account requiredWhy it scored this way

Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.

Solicitation documents

The requirements that decide a bid — bonding, clearances, experience minimums, page limits — live in the attachments, not in the notice above. Start a free trial to upload them and have them read.

Draft the paperwork

Written against this notice and what you have told us about your company. Anything we do not know is marked [NEEDS INPUT] in the draft rather than guessed at — read it before you send it. Federal notices routinely put the real requirement in an attachment; adding the documents above makes every one of these materially better.

Start a free trial to draft these. Nothing is sent to an agency on your behalf, ever — you get a document to review, edit and submit yourself.

What would disqualify you

Read straight from the solicitation documents: the bonding, clearances, insurance minimums, experience thresholds and deadlines that decide whether you can bid at all — before you write a word.

Compliance matrix

Every stated and implied requirement, its source section, whether it is mandatory, and where your response will address it.

Proposal outline

A submission skeleton where every required element is a heading with its source requirement quoted beneath it. You write the substance; nothing gets forgotten.

Questions to submit

Genuine ambiguities and requirements that disadvantage a smaller bidder, drafted as questions you can submit before the Q&A deadline.

Past performance write-ups

Which of your prior awards best match this requirement, and draft write-ups in the format the agency asked for.

Solicitation details

Solicitation number
SPRDL1-24-R-0166
Notice type
Solicitation
NAICS
333914
Product service code
4320
Set-aside
Small Business Set Aside - Total
Posted
2026-09-14
Response deadline
Oct 16, 2026, 9:00 PM UTC
Contracting contact
john.moses@dla.mil

Market intelligence

Account requiredWho wins this work, and what it pays

Comparable awards under NAICS 333914 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.

Statement of work, as posted

** NOTE **: The below questions and answers regarding the Publications and Packaging CDRL portions of the solicitation are posted here for your reference: Packaging - Attachment 15 Question(s) 1. Section F calls out preserving all exterior unpainted metal surfaces in accordance with MIL-STD-2073 and coating said surfaces with preservative MIL-PRF-16173, Grade 1. In MIL-PRF-53051D, Section 3.10, it states that CARC paint shall not be applied to surfaces greater than 400F which means our metallic exhaust guard would not be painted. Is this coating able to be applied to surfaces greater than 400F? Additionally, is there a reason that preservative MIL-PRF-16173, Grade 1 is not listed in MIL-PRF-53051D anywhere? 2. Is there a MIL, ISO, FDA or some other standard that the corrosion preventative coating for food handling machinery and equipment must meet? Additionally, why is this not a requirement for the Type II - Pump Assembly, Water in MIL-PRF-53051D? The SPI calls out a preservative that can be used on bare metal when the item is in storage to prevent corrosion. I’m not sure where MIL-PRF-53051D is coming from, it maybe from the PD, which would be engineering and could be focusing on the inside of the pump. If the contractor wants to use a different preservative on non-metal, it will need to be from MIL-STD-2073, Appendix J and that preservative would need to meet the functionality of MIL-PRF-016173. 3. As far as the packaging preservative goes, these systems are painted with Chemical Agent Resistant Coating (CARC) which has anti-corrosive properties already in it as called out in MIL-PRF-53051D which is the MIL-PRF that these systems are manufactured too. Additionally, they are required based on the solicitation to be delivered in heat treated wooden crates. Is the packaging team stating that the preservative needs to be applied to the wooden crate or the exterior of the unit? The internals of the pump system are already cast aluminum and stainless steel which are inherently corrosion resistant.” I’m not seeing where MIL-PRF-53051D was listed in packaging. I reviewed the pkg contract language and CDRLs and didn’t see where it was mentioned. Did the contractor see that in the Purchase Description? If so, that would be an engineering question to answer. As far as the wooden crate, it needs to follow heat treatment requirements per DOD 4140.65M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material as laid out in Section D of the contract. *** Amendment 0005 is issued to extend the proposal due date out to 16 Oct 2026, change the FOB point from Origin to Destination for the production CLINs, revise the Section C Statement of Work (SOW) to remove references to Provisioning, Publications, and Technical Manuals, revise the list of addenda and attachments in Section J, remove select CDRLs and attachments as required, add a CDRL for a Commercial Off-the Shelf (COTS) Operator's Manual in Section J for government review prior to approval, and add/delete or update any clauses or provisions as required (especially due to the revolutionary FAR overhaul). *** Amendment 0004 is issued to extend the proposal due date out to 05 Dec 2025 *** *** Amendment 0003 is issued to extend the proposal due date out to 21 Nov 2025 *** *** Amendment 0002 is issued to extend the proposal due date out to 31 Oct 2025 *** *** Amendment 0001 is issued to extend the proposal due date out to 10 Oct 2025 *** Item: Pumping Assembly, Water NSN: 4320-01-691-1630 P/N: M53051-2-2 (CAGE 81349, Government) Qty: 14 each basic, 14 each option Packaging: Military A FOB: Destination Contract Type: Definitive contract with 100% option for 365 days Notes: This procurement is established as a 100% Total Small Business SetAside. First Article Testing (FAT) is required (provision for FAT waiver is allowed) and Government approval must be obtained prior to manufacturing the production quantity. Part number M53051-2-2 (Water Pump, 600 GPM) is built utilizing the standards listed in MIL-PRF-53051D (dated 20 Apr 2022). A copy of the MIL-PRF is attached in the Pre-Solicitation notice for this opportunity. The solicitation includes a Statement of Work (SOW) in Section C, with a list of packaging data, safety/security and hazardous material data required by the Government. These details are listed on the solicitation as narratives, Contract Data Requirements List (CDRLs) and attachments. There are 7 CDRLs and 7 attachments that support the CDRLs. Thoroughly review the solicitation document and amendments for all requirements prior to submitting your proposal. ***** Contact the Contract Specialist to obtain all of the CDRL and attachment documentation via the DoD Safe Site. *****

Contact

Point of contact
John P. Moses
Role
not stated on this notice — SAM publishes a role for only about 5% of them, so this may be a contract specialist rather than the contracting officer
Email
john.moses@dla.mil
Secondary
dlawarrencontractopportunities@dla.mil
Request a debrief

After an award notice, request a debriefing. Time-limited — a required debrief must generally be requested within 3 days of notice.

Open email

Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.

Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.