GovSprint
← Back to today

Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement

Department of Defense · Department of the Army · W071 ENDIST PORTLAND
Account requiredWhy it scored this way

Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.

Solicitation documents

The requirements that decide a bid — bonding, clearances, experience minimums, page limits — live in the attachments, not in the notice above. Start a free trial to upload them and have them read.

Draft the paperwork

Written against this notice and what you have told us about your company. Anything we do not know is marked [NEEDS INPUT] in the draft rather than guessed at — read it before you send it. Federal notices routinely put the real requirement in an attachment; adding the documents above makes every one of these materially better.

Start a free trial to draft these. Nothing is sent to an agency on your behalf, ever — you get a document to review, edit and submit yourself.

What would disqualify you

Read straight from the solicitation documents: the bonding, clearances, insurance minimums, experience thresholds and deadlines that decide whether you can bid at all — before you write a word.

Compliance matrix

Every stated and implied requirement, its source section, whether it is mandatory, and where your response will address it.

Proposal outline

A submission skeleton where every required element is a heading with its source requirement quoted beneath it. You write the substance; nothing gets forgotten.

Questions to submit

Genuine ambiguities and requirements that disadvantage a smaller bidder, drafted as questions you can submit before the Q&A deadline.

Past performance write-ups

Which of your prior awards best match this requirement, and draft write-ups in the format the agency asked for.

Solicitation details

Solicitation number
W9127N26BA024
Notice type
Solicitation
NAICS
237310
Product service code
Y1LB
Set-aside
Small Business Set Aside - Total
Posted
2026-10-01
Response deadline
Oct 29, 2026, 7:00 PM UTC
Place of performance
Cascade Locks, OR
Contracting contact
christopher.d.burroughs@usace.army.mil

Market intelligence

Account requiredWho wins this work, and what it pays

Comparable awards under NAICS 237310 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.

Statement of work, as posted

*** 01 October 2026 - Amendment W9127N26BA0240005 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment effects changes to the Block 14 (Description of Amendment/Modification): The Solicitation Period is extended by 21 calendar days which changes the Solicitation Closing Date from October 8, 2026, to October 29, 2026. Solicitation Specifications, Section 01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS, Paragraph 1.18.4 Traffic Control Plan (TCP) edited. Solicitation Specifications, Section 01 45 00.25 25 CONSTRUCTION MANAGEMENT PLATFORM (CMP), Technical Section added in its entirety. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 18 September 2026 - Amendment W9127N26BA0240004 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment effects changes to the Block 14 (Description of Amendment/Modification): Solicitation Specifications, Section 31 68 13.00 99 – GROUND ANCHORS, Part 1 GENERAL, Paragraph 1.5.2 Qualifications are changed as detailed in the SUMMARY OF CHANGES. Solicitation Specifications, Section 31 73 20.00 99 – JET GROUTING, Part 1 GENERAL, Paragraph 1.7.1 Qualifications are changed as detailed in the SUMMARY OF CHANGES. Solicitation Specifications, Section 00 73 00 – Supplementary Conditions, Paragraph L. - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984), the Period of Performance is amended as detailed in the SUMMARY OF CHANGES. This will allow for work to occur during the 2029 and 2030 In Water Work Window years. Environmental permits remain unchanged by this amendment. Marine Mammal protections as listed in the specification, and as governed by the IHA, included with the Attachments, remain in effect for the permitted years. No in water work, that is governed by IHA, will be allowed beyond the IHA permit years allowed. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 09 September 2026 - Amendment W9127N26BA0240002 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment effects changes to the Block 14 (Description of Amendment/Modification): Solicitation Specifications, Section 01 57 19.00 25 - TEMPORARY ENVIRONMENTAL CONTROLS, Part 3 EXECUTION, Paragraph 3.4.3 PROFESSIONAL ARCHAEOLOGICAL MONITOR. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 03 September 2026 - Amendment W9127N26BA0240002 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement*** This amendment effects changes to block 13 of Standard Form 1442, the Solicitation Specifications, Section 00 21 13 – Instruction to Bidders, and Section 00 21 00 – Instructions. Additionally, it extends the solicitation period and provides for an additional site visit. The Solicitation Period is extended by 20 calendar days which changes the Solicitation Closing Date from September 18, 2026, to October 8, 2026. Site Visit Registration. Send an email to Michael R. Carl via email at michael.r.carl@usace.army.mil and Courney R. Hollins at courtney.r.hollins@usace.army.mil by COB Wednesday, 09 September 2026, to register for the site visit and provide first name, last name, and company/organization name. Site visit attendees must be U.S. citizens and possess a REAL ID to access the site. Acceptable forms of proof of citizenship for anyone born outside the USA are: US Birth Certificate: Must be certified & issued by either a US State or the US State Department. US Passport Undamaged: Issued by the US Dept of State, without limitation, does not need to be current, is/was valid for 10 years for adults and 5 years for children under 16. US Passport Card Undamaged: Issued by the US Dept of State, without limitation, does not need to be current. US Certificate of Citizenship: Issued by US Citizenship and Immigration Service. Consular Report of Birth Abroad: Issued by the US State Department. US Naturalization Certificate: Issued by US Citizenship and Immigration Service. Enhanced Driver’s License: from Michigan, Minnesota, New York, Vermont, or Washington. Acceptable ID: Real ID driver’s license. Enhanced driver’s license. Federal Identification Cards PIC/CAC/PIV/Etc. Transportation Worker Identification Card (TWIC). United States Passport or United States Passport Card. Driver’s license issued by the Department of State. *** 27 August 2026 - Amendment W9127N26BA0240001 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement*** This amendment inserts additional Government Furnished Information (GFI) as an attachment to the solicitation. The file “Power Line Layout” is provided for the Contractor’s information. The Government shall not be responsible for any interpretation of, or conclusion drawn, from the data or information by the Contractor. Information provided should be field verified by the Contractor. If there is a discrepancy between the solicitation plan set and the GFI, the solicitation plan set takes precedence. The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge. The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 34’4½” out-to-out, with two 11’0” travel lanes, two 2’0” shoulders, a 5’0” sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located immediately downstream of the existing bridge and, at its northern terminus, will fit entirely between the existing bridge and the Bonneville Power Administration transmission tower which is located to the south. Approach roadways will also be constructed to tie into the existing roadway alignment. The new fixed bridge will be located over the existing navigation channel and will provide an under clearance that is larger than is currently present under the existing bridge. The north abutment will be a concrete stub abutment with spread footing anchored into rock. The south abutment will be a concrete abutment that is supported by drilled shafts. To mitigate seismic hazards, portions of the existing bridge will be removed as part of the bridge construction requirement. The existing bridge provides for critical vehicular access to the Bonneville project that must remain open for the entirety of the construction project. This will likely require the contractor to construct the project in phases. In addition, lead and asbestos removal will be required as part of this requirement. Working within environmental and seasonal restrictions and barge crane lifting will be required in close proximity to a high voltage power line will also be necessary during performance of the required work.

Contact

Point of contact
Christopher Burroughs
Role
not stated on this notice — SAM publishes a role for only about 5% of them, so this may be a contract specialist rather than the contracting officer
Email
christopher.d.burroughs@usace.army.mil
Secondary
Justin.F.Figueredo@usace.army.mil
Submit questions

Ambiguities and requirements worth clarifying, written as questions you can send before the deadline.

Open email
Request documents

Ask for attachments, drawings or specifications referenced in the notice but not posted.

Open email
Add me to interested vendors

Ask to be listed as an interested vendor so other bidders can find you for teaming.

Open email

Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.

Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.