Department of Energy · PRINCETON LAB - DOE CONTRACTOR
Account requiredWhy it scored this way
Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.
The requirements that decide a bid — bonding, clearances, experience minimums, page limits — live in the attachments, not in the notice above. Start a free trial to upload them and have them read.
Draft the paperwork
Written against this notice and what you have told us about your company. Anything we do not know is marked [NEEDS INPUT] in the draft rather than guessed at — read it before you send it. Federal notices routinely put the real requirement in an attachment; adding the documents above makes every one of these materially better.
Start a free trial to draft these. Nothing is sent to an agency on your behalf, ever — you get a document to review, edit and submit yourself.
What would disqualify you
Read straight from the solicitation documents: the bonding, clearances, insurance minimums, experience thresholds and deadlines that decide whether you can bid at all — before you write a word.
Compliance matrix
Every stated and implied requirement, its source section, whether it is mandatory, and where your response will address it.
Proposal outline
A submission skeleton where every required element is a heading with its source requirement quoted beneath it. You write the substance; nothing gets forgotten.
Questions to submit
Genuine ambiguities and requirements that disadvantage a smaller bidder, drafted as questions you can submit before the Q&A deadline.
Past performance write-ups
Which of your prior awards best match this requirement, and draft write-ups in the format the agency asked for.
Solicitation details
Solicitation number
RFP_26-081JR
Notice type
Combined Synopsis/Solicitation
NAICS
811310
Product service code
J039
Set-aside
No Set aside used
Posted
2026-09-30
Response deadline
Oct 20, 2026, 8:00 PM UTC
Place of performance
Princeton, NJ
Contracting contact
jrussell@pppl.gov
Market intelligence
Account requiredWho wins this work, and what it pays
Comparable awards under NAICS 811310 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.
Princeton Plasma Physics Laboratory is looking to acquires PPPL personnel perform much of the routine required inspections; however, during peak workload periods and for large repairs, the Subcontractor may be called upon on to perform these tasks. This SOW provides the requirements for subcontracted periodic inspections. It also addresses the assignment to a Subcontractor of the requirement to perform remedial (corrective) maintenance, which may be determined necessary based upon the periodic inspections, in order to make a piece of equipment operable in accordance with governing codes and standards, and the performance of routine maintenance as recommended by the various equipment manufacturers. Unless specified and agreed to otherwise in writing, PPPL requires that the work be performed in accordance with the manufacturer specifications and procedures. After any maintenance is performed, a complete thorough check of equipment function shall be performed including all safety features and interlocks as described by the manufacturer. Additionally, the Subcontractor may be called upon for advice for crane upgrades and performance enhancements. Several large cranes (Items 3, 13, 33, 34 on Attachment A) are retrofitted with Catron/Electromotive radio remote controls and Variable Frequency Drives. Familiarity with and qualification in maintenance and adjustments of these cranes and control systems is mandatory. Subcontractor's membership in the Crane Manufacturers Association of America (CMAA) is regarded as highly desirable, and a measure of the Subcontractor's professionalism and technical qualification for performing tasks such as assigned under the Statement of Work.PPPL does not guarantee any minimum level of work and reserves the right to use other sources to perform the inspection and maintenance tasks when PPPL determines this to be appropriate A mandatory preproposal zoom meeting has been scheduled for 1:30 PM on 8 Oct 2026. Zoom invitations will only be sent to firms completing and submitting an RFP acknowledgement form
Contact
Point of contact
JIMMY RUSSELL
Role
not stated on this notice — SAM publishes a role for only about 5% of them, so this may be a contract specialist rather than the contracting officer
Email
jrussell@pppl.gov
Submit questions
Ambiguities and requirements worth clarifying, written as questions you can send before the deadline.
Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.
Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.