Z2DA--589A7-25-503 Prepare Site for Cath Lab Equipment FY26 NRM
Department of Veterans Affairs · 255-NETWORK CONTRACT OFFICE 15 (36C255)
Account requiredWhy it scored this way
Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.
Written against this notice and what you have told us about your company. Anything we do not know is marked [NEEDS INPUT] in the draft rather than guessed at — read it before you send it.
Start a free trial to draft these. Nothing is sent to an agency on your behalf, ever — you get a document to review, edit and submit yourself.
Compliance matrix
Every stated and implied requirement, its source section, whether it is mandatory, and where your response will address it.
Proposal outline
A submission skeleton where every required element is a heading with its source requirement quoted beneath it. You write the substance; nothing gets forgotten.
Questions to submit
Genuine ambiguities and requirements that disadvantage a smaller bidder, drafted as questions you can submit before the Q&A deadline.
Past performance write-ups
Which of your prior awards best match this requirement, and draft write-ups in the format the agency asked for.
Solicitation details
Solicitation number
36C25526R0142_1
Notice type
Solicitation
NAICS
236220
Product service code
Z2DA
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Posted
2026-07-22
Response deadline
Aug 24, 2026, 7:00 PM UTC
Place of performance
Wichita, KS
Contracting contact
tonesha.king@va.gov
Market intelligence
Account requiredWho wins this work, and what it pays
Comparable awards under NAICS 236220 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.
Contractor shall perform construction and renovation of existing in Building 2 including, but not limited, rooms to: 216-2, 216A-2,217-2, 217A-2, 218-2, & other supporting spaces at the Robert J. Dole VAMC campus. This project will prepare approximately 1,500 SF of existing clinical space for the installation and operation of a new cardiac catheterization equipment, with the associated control and equipment room. All construction work shall be performed in full compliance with the completed set of bidding documents, including all contract drawings, specifications, and design narratives associated with this solicitation. The general contractor shall furnish all labor, supervision, materials, tools, and equipment necessary to execute the required scope of work. Construction will consist of, but is not limited to, the following: • Selective demolition and removal of existing systems, finishes, and equipment as identified. • Replacement or relocation of Architectural, MEP equipment, including medical gas modification,/electrical boom arm relocation, ceiling sterile air curtains upgrades, build-in control room desk/casework, additional wall outlets; including mechanical, plumbing, lighting, fire protection, and electrical systems as required. • Reconfigured partitions and doorways, including new architectural walls, doors, frames, and hardware. • Instillation of new interior finishes including ceiling, flooring, wall protection, and paint. Statement of Work for Project 589A7-25-203, Site Prep for Cath Lab Equipment ? April 10, 2026 2 • Site preparation for installation of government-furnished catheterization lab equipment, including structural supports, utilities, shielding modification, conduits, and interfaces. • Hazardous materials abatement, including asbestos, lead, and mold as identified or discovered during construction, following all applicable VA, EPA, OSHA, and state/local regulations. • All other items as described in the contract documents This construction work is located in an occupied, operational clinical facility and must be performed in a manner that allows medical care services to continue uninterrupted throughout construction, This requires carefully phased construction, strict adherence to ICRA, infection control, noise/vibration limits, and daily coordination with the VA COR and end users. Construction may also include the abatement of any asbestos as identified on the provided drawings. The construction of this project will take place in a very busy occupied building and is to be completed to allow medical care functions to be maintained uninterrupted throughout construction – necessitating carefully phased construction and coordination with VA COR/users, including strict adherence to ICRA requirements.
Contact
Point of contact
Tonesha Y King
Role
the contract specialist
Email
tonesha.king@va.gov
Submit questions
Ambiguities and requirements worth clarifying, written as questions you can send before the deadline.
Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.
Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.