High power hollow core fiber assembly for laser pulse compression
Department of Energy · SLAC Natl Accel Lab -DOE Contractor
Account requiredWhy it scored this way
Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.
The requirements that decide a bid — bonding, clearances, experience minimums, page limits — live in the attachments, not in the notice above. Start a free trial to upload them and have them read.
Draft the paperwork
Written against this notice and what you have told us about your company. Anything we do not know is marked [NEEDS INPUT] in the draft rather than guessed at — read it before you send it. Federal notices routinely put the real requirement in an attachment; adding the documents above makes every one of these materially better.
Start a free trial to draft these. Nothing is sent to an agency on your behalf, ever — you get a document to review, edit and submit yourself.
What would disqualify you
Read straight from the solicitation documents: the bonding, clearances, insurance minimums, experience thresholds and deadlines that decide whether you can bid at all — before you write a word.
Compliance matrix
Every stated and implied requirement, its source section, whether it is mandatory, and where your response will address it.
Proposal outline
A submission skeleton where every required element is a heading with its source requirement quoted beneath it. You write the substance; nothing gets forgotten.
Questions to submit
Genuine ambiguities and requirements that disadvantage a smaller bidder, drafted as questions you can submit before the Q&A deadline.
Past performance write-ups
Which of your prior awards best match this requirement, and draft write-ups in the format the agency asked for.
Solicitation details
Solicitation number
Req-369233
Notice type
Combined Synopsis/Solicitation
NAICS
335921
Product service code
AG13
Set-aside
Unrestricted
Posted
2026-10-14
Response deadline
Oct 22, 2026, 12:00 AM UTC
Place of performance
Menlo Park, CA
Contracting contact
espiritu@slac.stanford.edu
Market intelligence
Account requiredWho wins this work, and what it pays
Comparable awards under NAICS 335921 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.
SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions. SLAC has a requirement for a U.S. domestic end item source of the following: Qty-1 Main fiber holder kit few-cycle standard: fiber holder (entrance and exit), fiber protection tube, 2 pcs. KF25 bellows (nominal maximum pressure: 1.5 bar; operation will fail at 2.5-3 bar). The fiber is not included and should be ordered separately Qty-1 KF25 stainless steel tubing (length to be specified, max. 1 m) incl. two adjustable holders, one T-piece; O-rings and clamps. Qty-1 1`` vacuum window mount (20mm clear aperture) (window not included) Qty-1 High power mounted fiber (ID ¿ 500?m) with conical ceramic protection taper at entrance, length 5 bar Packaging Technical Evaluation below: Laser Wavelength- The hollow-core fiber (HCF) assembly must be compatible with operation at a laser wavelength of 1030 nm. The vendor must provide evidence of HCF pulse compression systems at or near this wavelength. Pulse energy- The HCF assembly must be compatible with an input pulse energy of 1.75 mJ at 1030 nm. Average power- The HCF assembly must be compatible with femtosecond laser input at an average power of 70 W. Operating conditions- The requirements for laser wavelength, pulse energy, and average power must be supported concurrently, rather than demonstrated only under separate operating conditions. The intended operating point is 1030 nm, 1.75 mJ per pulse, and 70 W average power, corresponding to 40 kHz repetition rate. Pulse duration- The HCF assembly is intended for second-stage pulse compression, with an approximately 30 fs input pulse duration and a target output pulse duration below 10 fs following compression optics at the specified operating conditions. Compression optics will be procured separately, but the hollow core fiber assembly should produce spectral broadening sufficient for less than 10 fs. The vendor should provide documented evidence, supporting the feasibility of achieving the target output pulse duration for a 80 W Light Conversion Carbide with their product as part of a second stage laser pulse compression system. The sub-10 fs target is a required performance objective and documented evidence of feasibility for a Light-Conversion Carbide with the procured system is desired to mitigate risk. Pressure requirements- The complete HCF assembly must have a nominal maximum working pressure of at least 2.5 bar absolute and must be capable of withstanding 4 bar absolute or above internal pressure without failure. The windows themselves may be sourced externally. Hollow core fiber- The HCF mounts must accommodate flexible fused-silica hollow-core fibers longer than or equal to 1.5 m and permit the fiber to be stretched and secured for laser pulse compression. Vacuum window interface- The assembly must include window adapter that provides vacuum-tight and pressure-tight connections to KF flanges. The window adapter must accommodate a standard 1-inch-diameter ultraviolet-grade fused-silica (UVFS) window and provide a clear aperture of at least 18 mm. The windows themselves will be sourced externally. Laser beam height- The assembly must include the mounts and hardware required to interface with a laser beam height of 5 inches above the optical table. Leadtime- The vendor must be able to ship the complete assembly within three months of receipt of the purchase order. Vacuum tubing- The assembly must include the vacuum tubing required for operation. The supplied tubing must use KF connections and permit the assembly to be configured for the intended vacuum and gas-filled pressure operating conditions. Gas line fittings will be procured separately. Hollow Core Fiber Assembly- Complete hollow core fiber assembly to route high energy laser beam under vacuum and overpressure and enable stretching of flexible fused silica hollow core fiber. UVFS windows to seal the assembly, and gas filling fitting and tubing will be sourced externally. Footprint- The hollow core fiber assembly should have <0.2 m length in the short dimension. Total long dimension of assembly should fit within 4.5 meter optical table length. The award will be made based upon the attached Lowest Price Technically Acceptable method best lead time. Marking of Proprietary/Confidential Information. Offerors shall properly mark and identify with a restrictive legend or information markings on pages of the proposal that contain Proprietary/ confidential information. For Offeror to be eligible for a subcontract award with the University and the U.S. Department of Energy (DOE), Offeror shall be registered with the System for Award Management (SAM). Entities may register at no cost directly at the SAM website: https://www.sam.gov. The resulting purchase order shall be performed in accordance with SLAC National Accelerator Laboratory's Terms and Conditions for Fixed Price Commercial Supplies and Services dated August 2023. NOTE: The following documents are attached in this solicitation. Buy American Act Certificate Reps and certs Rider - September 2022 -Domestic Reps and Certs International Rider - Foreign supplier Terms & Conditions for Fixed Price Commercial Supplies and Services, August 2023 and _Supplemental_Rider_Aug2026_Rev1 Please provide quoted price, delivery, technical compliance statement and certification for the attention of Bernadette Espiritu. Payment Terms: Net 30 days Freight terms will be FOB Destination Prepaid and Add. Domestic Suppliers - Freight terms will be FOB Destination Prepaid and Add. Foreign Supplier - Shipment will be made CIP SLAC, Menlo Park, and Duty Unpaid. Seller will be responsible for arranging and paying for freight and cargo insurance to the agreed destination.
Contact
Point of contact
Bernadette Espiritu
Role
not stated on this notice — SAM publishes a role for only about 5% of them, so this may be a contract specialist rather than the contracting officer
Email
espiritu@slac.stanford.edu
Submit questions
Ambiguities and requirements worth clarifying, written as questions you can send before the deadline.
Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.
Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.