GovSprint
← Back to today

Building 510 Substation Upgrade - Phase I

Department of Energy · BROOKHAVEN NATL LAB -DOE CONTRACTOR
Account requiredWhy it scored this way

Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.

Solicitation documents

The requirements that decide a bid — bonding, clearances, experience minimums, page limits — live in the attachments, not in the notice above. Start a free trial to upload them and have them read.

Draft the paperwork

Written against this notice and what you have told us about your company. Anything we do not know is marked [NEEDS INPUT] in the draft rather than guessed at — read it before you send it. Federal notices routinely put the real requirement in an attachment; adding the documents above makes every one of these materially better.

Start a free trial to draft these. Nothing is sent to an agency on your behalf, ever — you get a document to review, edit and submit yourself.

What would disqualify you

Read straight from the solicitation documents: the bonding, clearances, insurance minimums, experience thresholds and deadlines that decide whether you can bid at all — before you write a word.

Sources Sought response

A complete draft response — capability statement, relevant past performance, business size and socioeconomic status, and answers to the agency's specific questions.

Questions to submit

Genuine ambiguities and requirements that disadvantage a smaller bidder, drafted as questions you can submit before the Q&A deadline.

Past performance write-ups

Which of your prior awards best match this requirement, and draft write-ups in the format the agency asked for.

Solicitation details

Solicitation number
MH484019
Notice type
Sources Sought
NAICS
238210
Product service code
Z2NZ
Set-aside
Small Business Set Aside - Total
Posted
2026-10-12
Response deadline
Oct 23, 2026, 8:00 PM UTC
Place of performance
NY
Contracting contact
mhoward@bnl.gov

Market intelligence

Account requiredWho wins this work, and what it pays

Comparable awards under NAICS 238210 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.

Statement of work, as posted

Notice of Interest: BSA is seeking interested contractors capable of performing the work describled below and interested in receiving the forthcoming solicitation. The formal solicitation will be issued at a later date and will also be posted on SAM.gov at that time. Note that switchgear and transformers are being provided to the contractor as Government Furnished Equipment (GFE). Interested contractors are invited to submit a statement of interest along with a capabilities statement to BSA's Contract Specialist, Megan Howard, at mhoward@bnl.gov. Please include your Sam.gov Unique Entity Identifier (UEI). Project Description: The Physics Building was constructed in 1962 and much of the electrical system, original to the building, is beyond its useful life. These systems are also not compliant with current building codes, contain hazardous materials and need complete upgrades. The existing protective devices may not operate as specified, increasing the potential for arc-flash hazards and system damaging electrical faults. Repairs are cost prohibitive and may lead to extended unplanned outages in this mission critical facility. The Contractor shall provide all labor, supervision, materials (except as noted below), equipment, and services necessary for complete removal and upgrading of the existing Building 510 electrical substation equipment that feeds the newly replaced electrical distribution switchgear. This project includes the removal of two medium voltage substation transformers, one medium voltage oil switch and medium voltage distribution cabling. The project also includes the installation of a new exterior substation with two new medium voltage transformers, one pad mounted medium voltage switchgear and medium voltage feeders in a new concrete encased duct bank. The new substation will be constructed in the north-loading dock parking lot, complete with new transformer and switchgear pads, grounding and crushed stone. Long lead electrical equipment procurements are planned early in the project and construction of the substation infrastructure can be completed in parallel. Once the cutovers are completed the old transformers and oil switch will be removed from the equipment vault in the basement of Building 510. The Contractor shall not procure the switchgear or transformers under this contract. Installation will be executed in a phased approach in order to minimize electric service disruptions to the building and will provide provisions for future redundant circuit configuration.

Contact

Point of contact
Megan Howard
Role
not stated on this notice — SAM publishes a role for only about 5% of them, so this may be a contract specialist rather than the contracting officer
Email
mhoward@bnl.gov
Secondary
cwilson@bnl.gov
Submit questions

Ambiguities and requirements worth clarifying, written as questions you can send before the deadline.

Open email
Capability response

Introduce your firm against this requirement for a Sources Sought or market research notice.

Open email
Request documents

Ask for attachments, drawings or specifications referenced in the notice but not posted.

Open email
Add me to interested vendors

Ask to be listed as an interested vendor so other bidders can find you for teaming.

Open email

Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.

Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.