GovSprint
← Back to today

MOBILE POWER CONDITIONING UNIT/POWER SUPPLY SET

Department of Defense · Department of the Navy · NAVAIR WARFARE CTR AIRCRAFT DIV
Account requiredWhy it scored this way

Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.

Solicitation documents

The requirements that decide a bid — bonding, clearances, experience minimums, page limits — live in the attachments, not in the notice above. Start a free trial to upload them and have them read.

Draft the paperwork

Written against this notice and what you have told us about your company. Anything we do not know is marked [NEEDS INPUT] in the draft rather than guessed at — read it before you send it. Federal notices routinely put the real requirement in an attachment; adding the documents above makes every one of these materially better.

Start a free trial to draft these. Nothing is sent to an agency on your behalf, ever — you get a document to review, edit and submit yourself.

What would disqualify you

Read straight from the solicitation documents: the bonding, clearances, insurance minimums, experience thresholds and deadlines that decide whether you can bid at all — before you write a word.

Compliance matrix

Every stated and implied requirement, its source section, whether it is mandatory, and where your response will address it.

Proposal outline

A submission skeleton where every required element is a heading with its source requirement quoted beneath it. You write the substance; nothing gets forgotten.

Questions to submit

Genuine ambiguities and requirements that disadvantage a smaller bidder, drafted as questions you can submit before the Q&A deadline.

Past performance write-ups

Which of your prior awards best match this requirement, and draft write-ups in the format the agency asked for.

Solicitation details

Solicitation number
N6833527Q1014
Notice type
Presolicitation
NAICS
334511
Product service code
6130
Set-aside
No Set aside used
Posted
2026-10-06
Response deadline
Oct 21, 2026, 7:30 PM UTC
Contracting contact
molly.s.jackson.civ@us.navy.mil

Market intelligence

Account requiredWho wins this work, and what it pays

Comparable awards under NAICS 334511 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.

Statement of work, as posted

This action is for the procurement of a quantity of three (3) Mobile Power Conditioning Unit/Power Supply Set (PN: Z345P-220-1, NSN: 6130-01-657-1701) for the F/A-18 Kuwait program. The Original Equipment Manufacturer (OEM) of these items is Zitec, Inc., CAGE: 1R9V9. Under authority 10 U.S.C.2304(c)(1) and implemented in FAR 6.302-5(a)(2)(i), to try to develop this “asset" would incur costs that are not expected to be recouped through competition. Any attempt to procure a different part number would require the Government to fund a Preliminary Design Review (PDR) Critical Design Review (CDR) First Article Test (FAT) and Test & Evaluation (T&E) effort for a new vendor. The Government would have to fund personnel to be on the Source Selection Team to review proposals. Any change in form, fit or function would require changes to the existing Integrated Logistics Support (ILS) (technical publications, spares inventory, calibration) which would incur additional costs for update in the amount of $200,000 to $400,000. The process required to obtain an alternate asset is cost-prohibitive and would force the FMS Partner to utilize an asset that is not supportable or compatible with their current configuration and required need. This requirement will be processed under the authority 10 U.S.C.2304(c)(1), only one responsible source and no other supplies or services will satisfy agency requirements. Market Research was performed by the Lakehurst Technical team. The Original Equipment Manufacturer is Zitec, Inc., CAGE: 1R9V9. All technical data rights and information related to the Mobile Power Conditioning Units/Power Supply Units belongs to Zitec, Inc. No additional vendors were identified. The Government does not have in its possession sufficient, accurate, or legible data to purchase this part from anyone other than the current source nor have the means of acquiring said data. As such, this procurement will be issued on a sole-source basis to Zitec, Inc., CAGE: 1R9V9.

Contact

Point of contact
Molly Jackson
Role
not stated on this notice — SAM publishes a role for only about 5% of them, so this may be a contract specialist rather than the contracting officer
Email
molly.s.jackson.civ@us.navy.mil
Submit questions

Ambiguities and requirements worth clarifying, written as questions you can send before the deadline.

Open email
Capability response

Introduce your firm against this requirement for a Sources Sought or market research notice.

Open email
Request documents

Ask for attachments, drawings or specifications referenced in the notice but not posted.

Open email
Add me to interested vendors

Ask to be listed as an interested vendor so other bidders can find you for teaming.

Open email

Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.

Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.