GovSprint
← Back to today

29856173: Electrical design build Santa Barbra housing

Department of Homeland Security · U.S. Coast Guard · Shore Infrastructure — CEU Oakland (Contracting)
Account requiredWhy it scored this way

Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.

Forecast detail

Not yet solicited

The expected date passed 20 days ago. It may already be on the street — check SAM.gov before doing anything else.

Solicitation expected
July 31, 2026
Anticipated award
August 31, 2026 · Q4 2026
Estimated value
$500K to $1M
Period of performance
August 31, 2026 to November 26, 2026
Contract type
Firm Fixed Price
Expected vehicle
Design/Build Construction Services II (Regional) (RMACC II)
Competition
New Requirement, No Contract
No incumbent. A new requirement means nobody is defending a position here, and no one has an insider’s head start on the scope.

Who to talk to

At the forecast stage there is no active procurement, so contact is welcome rather than restricted — this is the one window where a direct conversation is straightforwardly appropriate.

The Small Business Specialist is usually the better first call. Helping firms like yours find and compete for this work is their actual job, and they can tell you whether a set-aside is still under consideration.

Published by the agency in its acquisition forecast, last updated September 23, 2025. Forecast entries are plans, not commitments — dates slip and requirements get cancelled, restructured or absorbed into another buy.

Requirement details

Solicitation number
F2025071947
Notice type
Forecast
NAICS
541330Engineering Services
Set-aside
Unrestricted
Posted
2025-09-23
Place of performance
Santa Barbra, CA

Market intelligence

Account requiredWho wins this work, and what it pays

Comparable awards under NAICS 541330 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.

Statement of work, as posted

Design build of entire site electrical system exterior of homes. Current electrical service for site is total of 400 AMP service, split between 200 amp for each side of the road. Four homes on each side of the road. Base LA/LB FE to execute Self-help level project to replace interior panels in homes, with new 100-amp grounded panels. The intent of this project is to replace service up to and connect to new 100 amp panels.

Contact

Point of contact
Tony Flores
Role
Requirements owner
Email
Tony.L.Flores@uscg.mil
Introduce your firm

A short introduction against this specific requirement, sent while the agency is still deciding how to buy it.

Open email
Ask about the acquisition strategy

Ask whether a set-aside is being considered, which vehicle is planned, and whether the agency wants industry input. This is the question that can still change the outcome.

Open email
Ask to be notified on release

Ask to be added to any industry-day or notification list so you are not relying on catching the posting yourself.

Open email

Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.

Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.