GovSprint
← Back to today

Replace Boat Bay Roof at Sector Northern Great Lakes, Sault Ste Marie, MI - PSN 12165041

Department of Homeland Security · U.S. Coast Guard · Shore Infrastructure — CEU Cleveland (Contracting)
Account requiredWhy it scored this way

Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.

Forecast detail

Not yet solicited

About 2 months until the solicitation is expected. This is the window a capture team works in — enough time to build a relationship, understand the requirement, and line up teaming partners.

Solicitation expected
December 15, 2026
Anticipated award
January 15, 2027 · Q2 2027
Estimated value
$1M to $2M
Period of performance
February 25, 2027 to June 5, 2027
Contract type
Firm Fixed Price
Expected vehicle
Design/Build Construction Services II (Regional) (RMACC II)
Competition
New Requirement, No Contract
No incumbent. A new requirement means nobody is defending a position here, and no one has an insider’s head start on the scope.

Who to talk to

At the forecast stage there is no active procurement, so contact is welcome rather than restricted — this is the one window where a direct conversation is straightforwardly appropriate.

The Small Business Specialist is usually the better first call. Helping firms like yours find and compete for this work is their actual job, and they can tell you whether a set-aside is still under consideration.

Published by the agency in its acquisition forecast, last updated September 10, 2026. Forecast entries are plans, not commitments — dates slip and requirements get cancelled, restructured or absorbed into another buy.

Requirement details

Solicitation number
F2026074130
Notice type
Forecast
NAICS
236210 — Industrial Building Construction
Set-aside
Unrestricted
Posted
2026-09-10
Place of performance
Sault Ste Marie, MI

Market intelligence

Account requiredWho wins this work, and what it pays

Comparable awards under NAICS 236210 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.

Statement of work, as posted

Replace Boat Bay Roof at Sector Northern Great Lakes, Sault Ste Marie, MI - PSN 12165041 1. WORK INCLUDED: Major items of work shall include the following: 1.1 Remove the existing metal fascia and wood blocking at roof edges. 1.2 Remove existing single ply EPDM roof system including roof membrane, roof flashings, roof insulation and roof edge to expose the existing concrete roof deck. The existing flat portion of the roof is constructed with tapered insulation sloping to roof drains. 1.3 All existing roof top equipment is scheduled to remain. All existing roof penetrations are scheduled to remain. 1.4 The contractor shall provide temporary heating or cooling to allow for the maintenance of 68 degrees F heat minimum with existing or temporary heating equipment or 78 degrees F maximum with existing or temporary cooling equipment. 1.5 Install new Polyvinyl-Chloride (PVC) roof system including new tapered roof insulation, multiple ply roof membrane with ½” gypsum cover board, associated roof flashings including various base and pipe penetration configurations. Existing roof drains shall be in sump pans. 1.6 Provide and install new curbs at roof top HVAC units to accommodate new roofing thickness. Secure split-system air conditioners to new roof. Disconnect, remove, store, and protect the existing exhaust fans during re-roofing operations, then re-install to the original condition on a new curb. No electrical, mechanical, or controls work outside of disconnection and reconnection is called for. 1.7 Install new wood parapet wall at roof edge to accommodate new roofing thickness and install new metal fascia. Install scuppers at Admin/Barracks roof and Galley roof. 1.8 Install new overflow drains (4 locations) and 5” cast iron piping under the roof structure down to outlet at 36” above grade. 1.9 Work associated with these items are described in the following specification sections and/or are shown on the contract drawings. Incidental work items not listed above and necessary for completing the project shall be included.

Contact

Point of contact
Robert Spangler
Role
Requirements owner
Email
Robert.t.spangler@uscg.mil
Introduce your firm

A short introduction against this specific requirement, sent while the agency is still deciding how to buy it.

Open email
Ask about the acquisition strategy

Ask whether a set-aside is being considered, which vehicle is planned, and whether the agency wants industry input. This is the question that can still change the outcome.

Open email
Ask to be notified on release

Ask to be added to any industry-day or notification list so you are not relying on catching the posting yourself.

Open email

Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.

Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.