GovSprint
← Back to today

BBT OK0005 NATC Renew D3030 Cooling Generating Systems

Department of Homeland Security · U.S. Customs and Border Protection · Air and Marine — Administration and Facilities Contracting Division (AFCD)
Account requiredWhy it scored this way

Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.

Forecast detail

Not yet solicited

The expected date passed 7 days ago. It may already be on the street — check SAM.gov before doing anything else.

Solicitation expected
August 13, 2026
Anticipated award
September 7, 2026 · Q4 2026
Estimated value
$500K to $1M
Period of performance
October 1, 2026 to March 30, 2027
Contract type
Firm Fixed Price
Expected vehicle
Other Transaction Authority
Competition
New Requirement, No Contract
No incumbent. A new requirement means nobody is defending a position here, and no one has an insider’s head start on the scope.

Who to talk to

At the forecast stage there is no active procurement, so contact is welcome rather than restricted — this is the one window where a direct conversation is straightforwardly appropriate.

The Small Business Specialist is usually the better first call. Helping firms like yours find and compete for this work is their actual job, and they can tell you whether a set-aside is still under consideration.

Published by the agency in its acquisition forecast, last updated August 13, 2026. Forecast entries are plans, not commitments — dates slip and requirements get cancelled, restructured or absorbed into another buy.

Requirement details

Solicitation number
F2026074181
Notice type
Forecast
NAICS
238220Plumbing, Heating, and Air-Conditioning Contractors
Set-aside
Unrestricted
Posted
2026-08-13
Place of performance
Oklahmoma City, OK

Market intelligence

Account requiredWho wins this work, and what it pays

Comparable awards under NAICS 238220 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.

Statement of work, as posted

The replacement of the existing cooling system and pneumatic dampeners with new electrical connection. 1. Remove the existing Carrier 90-ton air cooled chiller and properly remove refrigerant 410-A (Freon). The work will also include the removal of pneumatic dampeners and piping for each of them. 2 The new unit will be placed on the existing pad and will be at minimum a 100-ton air cooled chiller to run at maximum efficiency and have a gas fired element to aid in heating mode during wintertime. 3 Install new electrical panel to match the power requirement of the chiller electrical load. 4 Contractor will be responsible for contracting a crane for the removal and installation of the chillers. Acquisition Strategy: This is an 8(a) direct award.

Contact

Point of contact
Augrelio Pinales
Role
Requirements owner
Email
augrelio.h.pinales@cbp.dhs.gov
Introduce your firm

A short introduction against this specific requirement, sent while the agency is still deciding how to buy it.

Open email
Ask about the acquisition strategy

Ask whether a set-aside is being considered, which vehicle is planned, and whether the agency wants industry input. This is the question that can still change the outcome.

Open email
Ask to be notified on release

Ask to be added to any industry-day or notification list so you are not relying on catching the posting yourself.

Open email

Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.

Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.