GovSprint
← Back to today

Installation of Electronic Charting Systems (ECS/ECDIS) Computers and KVM Hardware on WLIC-75 and WPB-87 Platforms

Department of Homeland Security · U.S. Coast Guard · CG-C5I — C5I C32 C2PL (Contracting)
Account requiredWhy it scored this way

Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.

Forecast detail

Not yet solicited

The expected date passed 13 days ago. It may already be on the street — check SAM.gov before doing anything else.

Solicitation expected
August 7, 2026
Anticipated award
September 18, 2026 · Q4 2026
Estimated value
$2M to $5M
Period of performance
September 25, 2026 to November 25, 2029
Contract type
Firm Fixed Price
Expected vehicle
IDIQ TO/DO (Non Strategic Sourcing Vehicle Multiple Award Contract)
Competition
New Requirement, No Contract
No incumbent. A new requirement means nobody is defending a position here, and no one has an insider’s head start on the scope.

Who to talk to

At the forecast stage there is no active procurement, so contact is welcome rather than restricted — this is the one window where a direct conversation is straightforwardly appropriate.

The Small Business Specialist is usually the better first call. Helping firms like yours find and compete for this work is their actual job, and they can tell you whether a set-aside is still under consideration.

Published by the agency in its acquisition forecast, last updated July 30, 2026. Forecast entries are plans, not commitments — dates slip and requirements get cancelled, restructured or absorbed into another buy.

Requirement details

Solicitation number
F2026074559
Notice type
Forecast
NAICS
334511Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
Set-aside
SB
Posted
2026-07-30
Place of performance
Multiple

Market intelligence

Account requiredWho wins this work, and what it pays

Comparable awards under NAICS 334511 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.

Statement of work, as posted

Task Area 1 (WLIC-75): Recapitalization of 1SG38-CGECS(V)7B on the Coast Guard Buoy Inland Construction Tender – 75-foot (WLIC-75), deployed under the Coast Guard Electronic Charting System (CGECS) Computer and Monitor Recap Project. Task Area 2 (WPB-87): Installation of the CGECDIS2(V)4 Electronic Chart Display and Information System on USCG 87-foot Marine Protector class cutters. Task Area 3 (WPB-87, Optional): Replacement of the Automatic Identification System (AIS) transponder aboard WPB-87 hulls. The existing L3 Protec A3 EAIS transponder is replaced with the Raymarine 1SG38-AIS-2(V)2 AIS5000 system. This would be in conjunction with Task Area 2 where applicable.

Contact

Point of contact
Richard Caruso
Role
Requirements owner
Email
richard.h.caruso@uscg.mil
Secondary
Michael.J.Leska@uscg.mil
Introduce your firm

A short introduction against this specific requirement, sent while the agency is still deciding how to buy it.

Open email
Ask about the acquisition strategy

Ask whether a set-aside is being considered, which vehicle is planned, and whether the agency wants industry input. This is the question that can still change the outcome.

Open email
Ask to be notified on release

Ask to be added to any industry-day or notification list so you are not relying on catching the posting yourself.

Open email

Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.

Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.