GovSprint
← Back to today

Y1DZ--PN: 636-27-101, Design-Build, Install Temporary Chillers {OM} FY27 NRM 36C263-27-AP-0586

Department of Veterans Affairs · NETWORK CONTRACT OFFICE 23 (36C263)
Account requiredWhy it scored this way

Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.

Solicitation documents

The requirements that decide a bid — bonding, clearances, experience minimums, page limits — live in the attachments, not in the notice above. Start a free trial to upload them and have them read.

Draft the paperwork

Written against this notice and what you have told us about your company. Anything we do not know is marked [NEEDS INPUT] in the draft rather than guessed at — read it before you send it. Federal notices routinely put the real requirement in an attachment; adding the documents above makes every one of these materially better.

Start a free trial to draft these. Nothing is sent to an agency on your behalf, ever — you get a document to review, edit and submit yourself.

What would disqualify you

Read straight from the solicitation documents: the bonding, clearances, insurance minimums, experience thresholds and deadlines that decide whether you can bid at all — before you write a word.

Compliance matrix

Every stated and implied requirement, its source section, whether it is mandatory, and where your response will address it.

Proposal outline

A submission skeleton where every required element is a heading with its source requirement quoted beneath it. You write the substance; nothing gets forgotten.

Questions to submit

Genuine ambiguities and requirements that disadvantage a smaller bidder, drafted as questions you can submit before the Q&A deadline.

Past performance write-ups

Which of your prior awards best match this requirement, and draft write-ups in the format the agency asked for.

Solicitation details

Solicitation number
36C26327R0003
Notice type
Presolicitation
NAICS
238220
Product service code
Y1DZ
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Posted
2026-10-14
Response deadline
Oct 30, 2026, 3:00 PM UTC
Place of performance
Omaha, NE
Contracting contact
michael.warrick@va.gov

Market intelligence

Account requiredWho wins this work, and what it pays

Comparable awards under NAICS 238220 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.

Statement of work, as posted

Presolicitation Notice Presolicitation Notice Page 4 of 4 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 4 This is a Pre-Solicitation Notice regarding Project Number: 636-27-101, Design-Build, Install Temporary Chillers {OM} for the VA Nebraska-Western Iowa Health Care System (VANWIHCS) at the Omaha VA Medical Center in Omaha, Nebraska. The Department of Veterans Affairs, Network Contracting Office 23 (NCO 23), is preparing to issue a Two-Phase solicitation for a Design-Build contract for this project. Note: This is a Pre-Solicitation Notice only, the Solicitation will be posted for at least 15 days from the date of this notice. This is NOT a Request for Proposal (RFP). ESTIMATED (On or Around) SOLICITATION DATE (Phase I): on or about 11/9/2026 ESTIMATED (On or Around) AWARD DATE: 03/31/2027 SET-ASIDE: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) NAICS: 238220, Commercial and Institutional Building Construction $19.0 Million PROJECT MAGNITUDE: Between $2,000,000 and $5,000,000. THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE. In accordance with Public Law 109-461 and VAAR 819.7003 (b), bidders must be registered, certified, and listed in the SBA certification database at  https://veterans.certify.sba.gov/ as a SDVOSB/VOSB. Only bids from verified SDVOSB s at SBA certification database at the time of proposal submission shall be deemed responsive. All non-responsive bids shall be rejected and ineligible for award. Project Overview The project will require the selected contractor to provide all design, labor, materials, tools and equipment, and construction services necessary for the design and construction of the Project Number: 636-27-101, Design-Build, Install Temporary Chillers {OM} for the VA Nebraska-Western Iowa Health Care System (VANWIHCS) at the Omaha VA Medical Center in Omaha, Nebraska as defined by the Performance of Work Statement (PWS). The Two-Phase Design-Build solicitation and evaluation process shall be conducted in accordance with Revolutionary FAR Overhaul (RFO) 36.101-2 -Two-Phase Design-Build Selection Procedures. The issued Request for Proposal (RFP) shall set forth the requirements for responding to Phase I of the solicitation, as well as all technical evaluation factors and sub-factors for both Phase I and Phase II. At the closing date of the Phase I Solicitation, the government shall evaluate responsive proposals received in response to Phase I of the solicitation. No more than five (5) contractors will move forward to Phase II. Only those successful firms selected as a result of Phase I evaluations will be requested to submit technical and pricing proposals for Phase II. Phase II proposals shall be evaluated in accordance with the Phase II Evaluation Process. Background. This project requires a Design-Build (DB) Team to provide all professional design services, construction/installation, and commissioning necessary to integrate two government furnished-contractor installed Trane 1250-ton chillers into the Omaha VA Medical Center s central chilled-water system. Additionally, the scope of work includes the design and construction/installation of weatherproof chiller enclosures, associated mechanical/electrical infrastructure and all required civil (site preparation) and architectural improvements (new and existing buildings/enclosures) to support the installation. The contractor will utilize the supplied construction drawings and specifications from project 636-10-110 (enclosure 2) as Bridge Documents showing the general intent of this project and review the inventory list (enclosure 1) detailing all existing electrical, mechanical, structural, and other relevant components that are currently stored by the VA. It is the VA s preference that wherever feasible the design-build team incorporate these stored materials and equipment into the project. The D-B Team shall review the provided inventory list and assess the suitability of each item for reuse within the project scope. Successful offeror must be an integrated Design-Build team including licensed Architects, Engineers, and Construction specialists. At minimum, design disciplines shall include architectural, civil, structural, mechanical, electrical, plumbing, environmental, and fire protection engineering. Flowdown Requirements: All subcontractors shall adhere to the same requirements, with written acknowledgment required. NOTE: This Performance of Work Statement (PWS) will refer to the collective Design-Build Team, which includes both Design and Construction, for performance requirements pertaining to the entire scope of work. Where appropriate, Design Team or Construction Team may be used for specificity. All elements of design, construction, and post-construction are included in this PWS. Anticipated Period of Performance: The contract Period of Performance for the design phase shall be 120 calendar days from the Notice of Proceed. Period of Performance for total design and construction is 260 calendar days from the Notice of Proceed. The time stated for completion includes final cleanup of the premises, as-builts and closeout documents. If construction completion occurs during winter or other conditions that prevent immediate commissioning, the Contractor shall demobilize after completing the installation, connections, and equipment readiness requirements. The Contractor shall return to the site when conditions permit to perform commissioning, functional testing, punch-list completion, and as-built verification. The total period of performance shall not exceed 360 calendar days after issuance of the Notice to Proceed, unless otherwise authorized in writing by the Contracting Officer. All prospective bidders must have a Unique Entity Identifier (UEI) and must be registered and active in the SAM database (http://www.sam.gov). All prospective bidders must complete electronic online Representations and Certifications within SAM. The eventual awardee shall also have on file a current Department of Labor VETS4212 Federal Contractor Reporting filing at https://www.dol.gov/agencies/vets/programs/vets4212 (if applicable).

Contact

Point of contact
Michael B. Warrick
Role
Contracting Specialist
Email
michael.warrick@va.gov
Submit questions

Ambiguities and requirements worth clarifying, written as questions you can send before the deadline.

Open email
Capability response

Introduce your firm against this requirement for a Sources Sought or market research notice.

Open email
Request documents

Ask for attachments, drawings or specifications referenced in the notice but not posted.

Open email
Add me to interested vendors

Ask to be listed as an interested vendor so other bidders can find you for teaming.

Open email

Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.

Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.