GovSprint
← Back to today

Repair B632, Fire Suppression and Hangar Door

Department of Defense · Department of the Army · W7M6 USPFO ACTIVITY ILANG 182
Account requiredWhy it scored this way

Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.

Draft the paperwork

Written against this notice and what you have told us about your company. Anything we do not know is marked [NEEDS INPUT] in the draft rather than guessed at — read it before you send it.

Start a free trial to draft these. Nothing is sent to an agency on your behalf, ever — you get a document to review, edit and submit yourself.

Compliance matrix

Every stated and implied requirement, its source section, whether it is mandatory, and where your response will address it.

Proposal outline

A submission skeleton where every required element is a heading with its source requirement quoted beneath it. You write the substance; nothing gets forgotten.

Questions to submit

Genuine ambiguities and requirements that disadvantage a smaller bidder, drafted as questions you can submit before the Q&A deadline.

Past performance write-ups

Which of your prior awards best match this requirement, and draft write-ups in the format the agency asked for.

Solicitation details

Solicitation number
W50S7T26BA004
Notice type
Solicitation
NAICS
236220
Product service code
Y1BZ
Set-aside
Small Business Set Aside - Total
Posted
2026-08-11
Response deadline
Aug 19, 2026, 6:00 PM UTC
Place of performance
Peoria, IL
Contracting contact
melissa.grice4.civ@army.mil

Market intelligence

Account requiredWho wins this work, and what it pays

Comparable awards under NAICS 236220 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.

Statement of work, as posted

11 AUG 26: Amendment 0003 is uploaded and incorporates updated specifications and drawings. Reference attachments "B632_Addendum_1_Narrative_20260811" (4 pages); "B632_Addendum_1_Specifications_20260811" (671 pages); and "B632_Addendum_1_Drawings_20260811" (10 pages). All other terms and conditions remain unchanged. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 06 AUG 26/1437hrs CST: Amendment 0002 is uploaded and extends the solicitation closing date/bid opening to August 19, 2026. All other terms and conditions remain unchanged. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 06 AUG 26: Questions and Answers a/o 06 Aug 26 are uploaded. Attachment "W50S7T-26-B-A004, Question 29 supporting pics_20260806" is uploaded. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 03 AUG 26: Questions and Answers a/o 03 Aug 26 are uploaded. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 27 JUL 26: Amendment 0001 is uploaded and extends the solicitation closing date/bid opening to August 12, 2026. All other terms and conditions remain unchanged. Questions and Answers a/o 27 Jul 26 are uploaded. Attachment "Brand-Name Only Justification - Simplex_Repair B632_Redacted" is uploaded. Attachment titled "FILE_1810_Hangar Door Elec Plans" is uploaded. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 23 JUL 26: Questions and Answers a/o 23 Jul 26 are uploaded. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 16 JUL 26: Questions and Answers a/o 16 Jul 26 are uploaded. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 15 JUL 26: Pre-Bid Conference Meeting Minutes, Slides, and Sign-in Sheet are uploaded. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ The Illinois National Guard has an Invitation for Bids to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for Repair of the Fire Suppression and Hangar Door for Building 632 at the 182d Airlift Wing, Peoria, IL. Work includes the repair of the existing fire protection and detection systems. Remove existing AFFF tanks and existing piping and replace with new water pipes and pumps. Resize pumps in the Base Pump House, Building 831 to adequately provide pressure to the fire water loop. Remove existing Megadoor hangar doors at north door of building 632, mullion doors, motors, and associated conduit, wire, etc. Provide and Install new Megadoor vertical lift hangar door system and associated components. The Megadoor vertical lift hangar door by ASSA ABLOY is sole source specific for compatibility to existing installation systems (noted justifications will be included with solicitation). In addition to the base work described above, the solicitation will include the following option line item: Option 1: Provide and Install New Generator. The contract duration will be 365 calendar days after notice to proceed to include inspection and punch list. This project is set aside 100% for Small Business. The North American Industry Classification System (NAICS) Code is 236220, with a small business size standard of $45,000,000. The magnitude of construction is between $5,000,000 and $10,000,000. The pre-bid conference is being held on July 15, 2026, at 10am CDT. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-bid conference. All questions for the pre-bid conference must be submitted by July 10, 2026 via email to melissa.grice4.civ@army.mil. The bid opening date is scheduled for July 29, 2026 at 1:00pm CDT. Interested offerors must be registered in the System for Award Management (SAM). To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration). The solicitation and associated information and the plans and specifications will be available only from the Contract Opportunities page at SAM.gov. Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states “By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded”. In accordance with FAR 36.211(b), the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements. DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror’s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.

Contact

Point of contact
Melissa Grice
Role
not stated on this notice — SAM publishes a role for only about 5% of them, so this may be a contract specialist rather than the contracting officer
Email
melissa.grice4.civ@army.mil
Secondary
nicholas.marzinzik@us.af.mil
Request a debrief

After an award notice, request a debriefing. Time-limited — a required debrief must generally be requested within 3 days of notice.

Open email

Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.

Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.