GovSprint
← Back to today

Fort A.P. Hill Timber Sale Invitation for Bid # DACA65-B-27-02

Department of Defense · Department of the Army · W2SD ENDIST NORFOLK
Account requiredWhy it scored this way

Every reason behind the verdict rather than the headline one — which of your certifications match, how much runway is left, whether the work is your size, and what we would need to know to sharpen it.

Draft the paperwork

Written against this notice and what you have told us about your company. Anything we do not know is marked [NEEDS INPUT] in the draft rather than guessed at — read it before you send it.

Start a free trial to draft these. Nothing is sent to an agency on your behalf, ever — you get a document to review, edit and submit yourself.

Compliance matrix

Every stated and implied requirement, its source section, whether it is mandatory, and where your response will address it.

Proposal outline

A submission skeleton where every required element is a heading with its source requirement quoted beneath it. You write the substance; nothing gets forgotten.

Questions to submit

Genuine ambiguities and requirements that disadvantage a smaller bidder, drafted as questions you can submit before the Q&A deadline.

Past performance write-ups

Which of your prior awards best match this requirement, and draft write-ups in the format the agency asked for.

Solicitation details

Solicitation number
DACA65-B-27-02
Notice type
Combined Synopsis/Solicitation
NAICS
113310
Product service code
5510
Set-aside
Unrestricted
Posted
2026-08-13
Response deadline
Sep 16, 2026, 5:00 PM UTC
Place of performance
Bowling Green, VA
Contracting contact
nicholas.g.mrjoian@usace.army.mil

Market intelligence

Account requiredWho wins this work, and what it pays

Comparable awards under NAICS 113310 at this agency — the incumbent, what they were paid, when their period of performance ends, and the real pricing distribution rather than the headline number. From public federal award records.

Statement of work, as posted

The U.S. Army Corps of Engineers is offering for sale three (3) items of standing timber on approximately 357 acres within six (6) separate harvest blocks at Fort A.P. Hill, Bowling Green, VA 22427 of which approximately the following volumes to be harvested: The sales are sold per Item by unit, harvested timber will be sold by WEIGHT by the ton. Item 1 - TIMBER IN 2 BLOCKS (92 ACRES) PINE SAWTIMBER – 2799 Tons PINE CHIP N SAW – 222 Tons PINE PULPWOOD – 1286 Tons OAK SAWTIMBER – 1303 Tons POPLAR SAWTIMBER – 434 Tons MISC. HARDWOOD SAWTIMBER – 46 Tons HARDWOOD PULPWOOD – 1249 Tons Tons of Chips (optional) – 7339 Tons Item 2 - TIMBER IN 1 BLOCKS (67 ACRES) PINE SAWTIMBER – 897 Tons PINE CHIP N SAW – 192 Tons PINE PULPWOOD – 1720 Tons OAK SAWTIMBER – 1441 Tons POPLAR SAWTIMBER – 527 Tons MISC. HARDWOOD SAWTIMBER – 30 Tons HARDWOOD PULPWOOD – 1039 Tons Tons of Chips (optional) – 3265 Tons Item 3 - TIMBER IN 3 BLOCKS (198 ACRES) PINE SAWTIMBER – 8685 Tons PINE CHIP N SAW – 903 Tons PINE PULPWOOD – 3309 Tons OAK SAWTIMBER – 1403 Tons POPLAR SAWTIMBER – 1789 Tons MISC. HARDWOOD SAWTIMBER – 1229 Tons HARDWOOD PULPWOOD – 2554 Tons Tons of Chips (optional) – 10871 Tons Contract Period of Performance: Item # one (1) Block # one (1), TA-06AB1-26, 60 Acres – All harvest operations including tree felling, skidding, processing at the log deck and hauling shall be complete prior to 1 April 2028, final site rehabilitation activities of this item shall be complete by 1 April 2028. No tree cutting 1 April to 30 September. Temporary closeout of skid trails shall occur if equipment will be moved either offsite or to a different log deck or if a severe storm event generally exceeding two inches (2”) of liquid precipitation occurs or is anticipated to saturate soils. Item # one (1) Block # two (2), TA-06AB2-26, 32 Acres – All harvest operations including tree felling, skidding, processing at the log deck and hauling shall be complete prior to 1 April 2028, final site rehabilitation activities of this item shall be complete by 1 April 2028. No tree cutting 1 April to 30 September. Temporary closeout of skid trails shall occur if equipment will be moved either offsite or to a different log deck or if a severe storm event generally exceeding two inches (2”) of liquid precipitation occurs or is anticipated to saturate soils. Item # two (2) Block # three (3), TA-06BA-26, 66 Acres – All harvest operations including tree felling, skidding, processing at the log deck and hauling shall be complete prior to 1 April 2028, final site rehabilitation activities of this item shall be complete by 1 April 2028. No tree cutting 1 April to 30 September. Temporary closeout of skid trails shall occur if equipment will be moved either offsite or to a different log deck or if a severe storm event generally exceeding two inches (2”) of liquid precipitation occurs or is anticipated to saturate soils. Item # three (3) Block # four (4), TA-01A-27, 60 Acres – All harvest operations including tree felling, skidding, processing at the log deck and hauling shall be complete prior to 1 April 2028, final site rehabilitation activities of this item shall be complete by 15 April 2027. No tree cutting 1 April to 30 September. Temporary closeout of skid trails shall occur if equipment will be moved either offsite or to a different log deck or if a severe storm event generally exceeding two inches (2”) of liquid precipitation occurs or is anticipated to saturate soils. Item # three (3) Block # five (5), TA-01B-27, 70 Acres – All harvest operations including tree felling, skidding, processing at the log deck and hauling shall be complete prior to 1 April 2028, final site rehabilitation activities of this item shall be complete by 1 April 2028. No tree cutting 1 April to 30 September. Temporary closeout of skid trails shall occur if equipment will be moved either offsite or to a different log deck or if a severe storm event generally exceeding two inches (2”) of liquid precipitation occurs or is anticipated to saturate soils. Item # three (3) Block # six (6), TA-02-27, 67 Acres – All harvest operations including tree felling, skidding, processing at the log deck and hauling shall be complete prior to 1 April 2028, final site rehabilitation activities of this item shall be complete by 1 April 2028. No tree cutting 1 April to 30 September. Temporary closeout of skid trails shall occur if equipment will be moved either offsite or to a different log deck or if a severe storm event generally exceeding two inches (2”) of liquid precipitation occurs or is anticipated to saturate soils. INSPECTION INVITED ON Wednesday 2 September 2026 BEGINNING AT 9:00 a.m. FOR ACCESS TO HARVEST AREAS ARRANGE IN ADVANCE FOR FAVORABLE VETTING. Sealed bids will be accepted until 1:00 p.m. Wednesday 16 September 2026 by the Acquisition, Management, and Disposal section, Real Estate District Forester at Environmental Resources Office (DPW) Building 1406 18125 Rendezvous Drive Fort Walker, Bowling Green, VA, and then opened publicly. Forms for use in submitting bids are attached within this posting as an Invitation for Bid link as a pdf file. This pdf file contains the terms and conditions of the sale, the procedure for submitting bids, and description of the timber all of which are contained in the attached Invitation for Bid form. **Always look for the most recent attached Invitation for Bid pdf as updates can be made to the invitation for bid should corrections be made or more information becomes available. **Interested parties may reach Mr. Nick Mrjoian for questions pertaining to bidding, the contract, or for further information on this standing timber sale prior to the week of bid opening by phone at (757) 639-0708. ** Important, please ensure all instructions for bidding are followed, ensure that your bid makes it to the appropriate location ON TIME **

Contact

Point of contact
Nicholas Mrjoian
Role
not stated on this notice — SAM publishes a role for only about 5% of them, so this may be a contract specialist rather than the contracting officer
Email
nicholas.g.mrjoian@usace.army.mil
Secondary
andrew.g.willey@usace.army.mil
Submit questions

Ambiguities and requirements worth clarifying, written as questions you can send before the deadline.

Open email
Request documents

Ask for attachments, drawings or specifications referenced in the notice but not posted.

Open email
Add me to interested vendors

Ask to be listed as an interested vendor so other bidders can find you for teaming.

Open email

Opens in your own mail client, addressed and with a subject line — you write the message. GovSprint never sends anything on your behalf.

Emails open in your mail client and are sent from your address, so the reply comes back to you and the exchange stays yours. Confirm the correct channel and any question deadline on the notice before sending — many solicitations require questions in a specific way.